Water Pump Installation
Installation is very important to operation and service life of a pump, therefore, please install and adjust a pump carfully.
Installation and anjustment
Clear off oil stain and dirt on the base, and put the base on ground.
Use gradienter to check the horizontal degree of base, and wedge irons are allowed to be used to adjust.
Pour cement into base and bolt holes of feet.
When cement is dried,check whether bolts of base and feet are loosened, tighten in a proper way, and check horizontal degree again.
Clean the support grounds under base,ground under feet of water pump and motor feet, and install water pump and motor onto the base.
A clearance shall be kept between shaft couplers, check whether water pump spindle and motor spindle are on a same center line, thin cushion sheets can be used to adjust. Measure the different between up-and-down length and left-to-right length of external circle of coupler shall not be more than 0.1mm. Between two couplers, difference between maixmum clearance and minimum clearance on a same circle shall not be greater than 0.3mm.
