Milestone Project Review|The Mining Project In The Republic Of Congo

- Mar 25, 2020-

Milestone Project Review|The mining project in The Republic of Congo

Introduction of Congo

Congo

 

The Republic of the Congo (English: The Republic of Congo; French: République du Congo), referred to as Congo (Brazzaville) for short, is located in central and western Africa, runs across the central part of the equator, and borders Congo (Kim) and Angola on the east and south sides, and connects Central Africa, Cameroon, Gabon west, and the Atlantic Ocean to the southwest. The coastline is more than 150 kilometers long, with a total area of 342,000 square kilometers.

The 13th to 14th centuries established the Kingdom of the Congo. Since the 15th century, it has been invaded by Portugal, Britain and France. It was classified as a French colony in 1884. It became an autonomous republic in 1958. It became completely independent on August 15, 1960 and was named the Republic of the Congo. It was renamed the People's Republic of the Congo in 1969 and renamed in 1991.

Project Background

South African customers who have cooperated for many years to develop large-scale mines in Congo need to purchase large quantities of pumps to support the overall development project of the mine. It is preliminarily expected to purchase more than 100 pumps.

From the development and design of the mine to the early planning and equipment construction, due to the large demand for equipment, not only has strict requirements on product quality, but also needs a complete set of perfect systems to support the normal operation of equipment in the later stage. In this context, the old customers in South Africa once again find us for cooperation.

 

Negotiation process

 

Customers in South Africa have cooperated with our company since 2012. Over the past few years, they have cooperated with many successful projects. They are very happy to cooperate with each other. Long term cooperation also strengthens mutual trust.

 

The negotiation process was also relatively smooth. According to the requirements of customers, our engineers and business personnel, after several discussions, developed a set of very detailed implementation plan according to the terrain of the mine, the surrounding operating environment and the needs of customers, which was recognized by customers.

 

Centrifugal pump ranges

  •  22 sets horizontal rubber slurry pump with motor

  •  12 sets vertical slurry pump with motor

  •  20 sets horizontal end suction pump with motor