• Take the pump out of the packaging and check for any transportation damage.
• Check whether the delivery is complete based on the included Production Order Combination List.
• Position and assemble the pump system on a suitable surface or suspend the pump using the grip.
• Position the pump on a paved surface when there is mud and sand.
• Check whether the pump impeller can turn freely.
• Make sure that the distance between the bottom and the supply is at least the same as the free passage, see the technical information.
• Assemble, if required, a non-return valve in the delivery pipe to prevent liquid flowing back. This non-return valve is already installed in the pump.
• Assemble (if possible) a globe valve on the delivery side.
• Install the highest point of the delivery pipe above the drain pipes of the street (ground level) to make sure that a drain return flow is not possible.
• Install the cover strip over the turnbuckle of the bracket that is located between the suction strainer.
For more detail of submersible waste water pump, please click this link.